Featured Project

Wyecroft Road & Dorval Drive Remediation

Location
Oakville, ON
Key Services
  • Excavation and Disposal
  • Shoring
Description

Milestone Environmental Contracting Inc. completed a soil remediation project for two commercial properties located in Oakville, Ontario. 

Key Challenges
  • Navigating work around a high-voltage buried concrete encased hydro duct. 
  • Working within two properties within a commercial area 
Key Solutions
  • Design and installation of a concrete underpinning system to protect the high-voltage buried concrete encased hydro duct. 
  • Design and installation of a caisson wall shoring system to facilitate the excavation of impacted soils. 
  • Design and installation of a pile and lagging shoring system to facilitate excavation of the impacted soil. 

Project Scope

Wyecroft Road 

  • Excavation and off-site disposal of 9,540 metric tonnes of non-hazardous contaminated soil to a licensed facility. 
  • Supply, placement, grading and compaction of over 8,060 metric tonnes of imported select subgrade backfill material. 

Dorval Drive 

  • Excavation and off-site disposal of 2,695 metric tonnes of non-hazardous contaminated soil to a licensed facility. 
  • Supply, placement, grading and compaction of over 2,200 metric tonnes of imported select subgrade backfill material. 