Milestone was awarded a contract for the design and installation of a Reverse Osmosis (RO) Water Treatment Plant (WTP) for the Eagle River Gold Mine Complex, approximately 50 km northwest of Wawa, Ontario. The goal was to treat water from the settling pond at the discharge of the primary tailings, addressing various parameters, with a focus on copper and iron levels, to meet required effluent limits.