Featured Projects  >  Brantford Low Permeability Barrier Wall

Brantford Low Permeability Barrier Wall

Type of Work

Soil and Groundwater Remediation

Key Services

Excavation Stabilization
Barrier Wall Installation

Location

Brantford, ON

Year

2016

Project Scope

  • Designed and installed a low permeability wall to allow for site remediation up to a vertical boundary adjacent to a privately owned railway right of way, which intersected the three target properties for remediation.
  • Supply, notification, and monitoring requirements associated with multiple ECA’s.
  • Installation of 355 m of a low permeability concrete barrier using a bentonite slurry excavation technique.
  • Wall dimensions were approximately 0.6 m wide by 5.0 to 6.5 m deep.

Key Highlights

  • Developed a low permeability/ temporary shoring solution that proved equally or more effective, less expensive, and faster to install, than traditional sheet pile or continuous caisson methods.
  • Developed a slot cut excavation technique that allowed for the safe full depth removal of soil adjacent to the barrier wall.