Milestone Environmental Contracting Inc. (Milestone) was awarded the contract to remove a landfill, remediate impacts and restore/enhance the habitat. A wide range of impacted material required careful management and offsite disposal at a range of approved and cost-effective locations. Remediation and habitat enhancement were required to protect several of Canada’s most important species at risk, including the Oregon Spotted Frog and the Pacific Water Shrew.

Type of Work
  • Soil and Groundwater Remediation
  • Decommissioning and Reclamation
Key Services
  • Excavation and Disposal
  • Water Treatment
  • Habitat Protection and Restoration
Key Highlights
  • Management/removal of Invasive species, native vegetation salvage.
  • Management and recovery of Species at Risk.
  • Management of all site water (from excavations and tributaries) with treatment to CCME freshwater aquatic life levels. Treated more than 3,000,000 litres of heavy metal and hydrocarbon impacted surface and ground water.
  • Foundation Demolition 6,000 cubic meters of landfill excavation and screening.
  • Management of Tributary excavations.
  • Loading, transport and disposal of sorted waste streams.
  • First Nations involvement and participation.